
Hello Ladun,
Believe it or not, this is Emma Abimbola Cole street in
Lekki Phase 1 in Lagos. And no, it’s not sometime in rainy July, it’s the
evening of 6th of January 2016.
Lekki Phase 1 in Lagos. And no, it’s not sometime in rainy July, it’s the
evening of 6th of January 2016.
The spot has been waterlogged throughout the harmattan and I
don’t know why. I’m getting pretty frustrated with it, because the road beneath
the flood has degraded and is now very bad.
We hear it has something to do with a leakage of pipes from the water
board which is very close to the bad spot.
Whatever it is, we the residents of the neighbourhood are quite
frustrated with it, it’s been so since I moved here almost two years now.
don’t know why. I’m getting pretty frustrated with it, because the road beneath
the flood has degraded and is now very bad.
We hear it has something to do with a leakage of pipes from the water
board which is very close to the bad spot.
Whatever it is, we the residents of the neighbourhood are quite
frustrated with it, it’s been so since I moved here almost two years now.
Please, publish this and shame the right authority into
doing their job (it’s a shame that that is the tactic tax-paying citizens have
to resort to for basic amenities in Nigeria). I’d be truly grateful if you do.
Thanks
doing their job (it’s a shame that that is the tactic tax-paying citizens have
to resort to for basic amenities in Nigeria). I’d be truly grateful if you do.
Thanks
From a frustrated resident of Lekki Phase 1
E gbo, Lekki residents how far?






Follow Us on Facebook – @LadunLiadi; Instagram – @LadunLiadi; Twitter – @LadunLiadi; Youtube – @LadunLiadiTV for updates


